Ask Fakespot Chat questions about this productAlpha
Add detailed feedback
Message
Loading suggested questions
Suggested Questions
Suggested Questions
No suggested questions were found
Pros & Cons
Pros
Unique & smart material (nylon with rubber woven adds to durability, non-slip grip, and is waterproof. Rubberized stripes that run the entire length, down the center of the leash. The handle is well padded and comfortable. Better than the thin nyl... Read More
The campground states that the dogs must be on leash at all times. This long lead works great to give my dogs some additional area to walk around and check out while still maintaining control. It gives them enough lead to be able to check out the boun... Read More
Cons
The clasp is not heavy enough and opened so the dog got loose. But the clip is straight up garbage.
Highlights
Quality
Love the quality feel security of this tracking line
Good quality nice rubbery track in center of line for good gripping
Price
Price was the same as the cheap ones
Overview
- How are reviewers describing this item?
great, good, durable, long and strong. - Our engine has profiled the reviewer patterns and has determined that there may be deception involved.
- Our engine has determined that the review content quality is low.
- Our engine has analyzed and discovered that 63.4% of the reviews are reliable.
- This product had a total of 436 reviews as of our last analysis date on Mar 31 2023.
Helpful InsightsBETA
Posted by a reviewer on Amazon
I have to stay very alert to her jumping a ditch or something
Posted by a reviewer on Amazon
No fence right now so she needs some freedom
Posted by a reviewer on Amazon
He could noodle around wherever and i could call him at any time
Posted by a reviewer on Amazon
Worse case i recreate it with a climbing carabiner
Posted by a reviewer on Amazon
I did put another clasp on it only because i feel like it may break if my dog takes off
Posted by a reviewer on Amazon
This is just me being overly careful
Posted by a reviewer on Amazon
My web canvas leash broke while trading our dog and thankfully it was in the woods on not on a busy roadway
Posted by a reviewer on Amazon
Then most of the time i would track mud back in
Review Count History
Price History
Ask Fakespot Chat questions about this productAlpha
Add detailed feedback
Message
Loading suggested questions
Suggested Questions
Suggested Questions
No suggested questions were found