Ask Fakespot Chat questions about this productAlpha
Add detailed feedback
Message
Loading suggested questions
Suggested Questions
Suggested Questions
No suggested questions were found
Pros & Cons
Cons
It was not cut. It was frayed on both ends of the break. The clasp that locks onto the dog collar is poorly made. It's lightweight but not durable.
Highlights
Quality
Comfortable grip handle sturdy material and thickness
It’s very sturdy and won’t break no matter how hard my big rambunctious shepherd pulls and the handle is very comfortable to hold
The material is stiff and doesnt get tangled very easily if at all when they are new
It drags on the ground at times but i’m hoping it will keep strong and remain durable
Price
I am glad i paid a few more dollars for the one with a handle as its prevented alot of rope burn
Shipping
The delivery came in the middle of the night waking my dogs and everyone in the house as a result
Competitiveness
Weve tried a different brand that was made of cotton but it gave us and our dog rope burns
Overview
- How are reviewers describing this item?
great, long, good, strong and easy. - Our engine has profiled the reviewer patterns and has determined that there is minimal deception involved.
- Our engine has detected that Amazon has altered, modified or removed reviews from this listing. We approximate total reviews altered up to 52.
- Our engine has discovered that over 90% high quality reviews are present.
- This product had a total of 4,085 reviews as of our last analysis date on Apr 20 2024.
Helpful InsightsBETA
Posted by a reviewer on Amazon
The cape cod beaches requires dogs be on leash
Posted by a reviewer on Amazon
I will add it is best to wear a pair of leather work gloves while using this leash in the event your animal decides to take off as you can easily get some wickedly long lasting rope burn
Posted by a reviewer on Amazon
I have never tied a dog in a yard and if my animal is unable or unwilling to listen to my commands i make it a point to truly walk them no matter rain snow or shine
Posted by a reviewer on Amazon
Mind you if you use this in the water be in the water with them as they can get wrapped up in it at times
Posted by a reviewer on Amazon
He chewed through similar version unattended near me in10 minutes
Posted by a reviewer on Amazon
I need it for safety in water swimming dont get tagked in it if youre swimming too
Posted by a reviewer on Amazon
Again they will chew through in minutes depending on dog but i like it
Posted by a reviewer on Amazon
I now have the 50 and the 20
Review Count History
Price History
Ask Fakespot Chat questions about this productAlpha
Add detailed feedback
Message
Loading suggested questions
Suggested Questions
Suggested Questions
No suggested questions were found