This analysis is outdated. Please reanalyze.

Overview
  • How are reviewers describing this item?
    good, great, bright, quality and perfect.
  • Our engine has profiled the reviewer patterns and has determined that there may be deception involved.
  • Our engine has determined that the review content quality is low.
  • Our engine has analyzed and discovered that 67.2% of the reviews are reliable.
  • This product had a total of 179 reviews as of our last analysis date on May 2 2020.
Details

BETA

This feature is in BETA, meaning the algorithms used to provide these results are constantly improving. These results might change.

Most positive reviewquestion

Very nice LED'S happy to find them on Amazon I'm very happy with my purchase!

Least authentic reviewquestion

Works great....I appreciate that the resistors come with them


Helpful Insights

BETA

This feature is in BETA, meaning the algorithms used to provide these results are constantly improving. These results might change.

    Posted by a reviewer on Amazon

    A few of them broke when we were bending them but otherwise they worked great.


    Posted by a reviewer on Amazon

    I had a bunch of rgb clear from china that constantly failed, blue to green shorts.


    Posted by a reviewer on Amazon

    So i gave a 4 star because i couldnt use them due to the shanks being a square shape.


    Posted by a reviewer on Amazon

    I added leds to christmas wreaths and instead of building blinking circuits i just inserted a blinking leds in each of the strings.


    Posted by a reviewer on Amazon

    Flashing frequency just right to use as a visual indicator.


    Posted by a reviewer on Amazon

    I don't know why i ordered 100.


    Posted by a reviewer on Amazon

    I have tried several in a parallel circuit some blink at the same rate some don't so depending on what you want check them out before you solder them inplace to get the combination you want.


    Posted by a reviewer on Amazon

    Blinks about twice a second for those wondering.

Review Count History
Loading...